- Following 0 users
- Followed by 0 users
- Votes 0
- Subscriptions 5
Activity overview
Latest activity by Land Survey-
Land Survey commented,
Rather than having to use the slower method c for overnight processing, could pix4d please implement a checkbox in the step 2 settings called “reoptimise project before running point cloud generati...
- View comment
- Land Survey
- Created
- 0 votes
-
Land Survey commented,
I often have surveys where I would like to choose which multiscale options I select. If I have concrete or tar-seal, multiscale produces a lot of noise whereas no multiscale leaves large holes. I'd...
- View comment
- Land Survey
- Created
- 0 votes
-
Land Survey commented,
I have a workflow where I produce multiple subprojects which I process using the "accurate location and orientation" pipeline. This goes well. I then merge the projects. This goes well. I then go t...
- View comment
- Land Survey
- Created
- 0 votes
-
Land Survey commented,
Thanks for the guide. When I merge projects, this is my workflow:1. Run step one for each subproject. 2. Mark GCPs in each subproject, and then reoptimise.3. Create a new project by merging the su...
- View comment
- Land Survey
- Created
- 0 votes
-
Land Survey commented,
You note that multiple GPUs are not utilised during processing. In the event of running multiple projects in parallel, will GPUs be separately assigned to each project, as is the case with multiple...
- View comment
- Land Survey
- Created
- 0 votes