How to update a Volume after editing the Point Cloud

Follow

 

After editing the Point Cloud, the volume needs to be recomputed. To do so:

1. Edit the point cloud (How to edit the point cloud in the rayCloud). 
2. Run step 3. DSM, Orthomosaic and Index.
3. On the Menu bar click View > Volumes.
4. Click Compute to update for the new volume. 

 
Warning: When reprocessing this step for a project, the existing outputs from this step are deleted and overwritten and outputs from Step 3 (that was previously completed) are deleted.
The existing results, if needed, have to be backed up in another folder to not be overwritten. 