Menu Process > Generate Quality Report

Index > Interface > Menu Process  Previous  |  Next 

 

 
Access: On the Menu bar, click Process > Generate Quality Report (enabled once step 1. Initial Processing has been completed).

Generate_Quality_Report.png

This process generates a new Quality Report that refers to the new reconstruction obtained after applying changes to the project once step 1. Initial Processing has been completed. Such changes can be:

  • Adding GCPs.
  • Adding Manual Tie Points.
  • Adding Check Points.
  • Changing coordinate systems.
  • Enabling/disabling images.
  • Running the Rematch and Optimize option.
 
Important: When adding GCPs, Manual Tie Points, Check Points, changing coordinate systems or enabling/disabling images, the Reoptimize option has to be applied before generating the new Quality Report.

 

Index > Interface > Menu Process  Previous  |  Next 
Was this article helpful?
2 out of 3 found this helpful

Article feedback (for troubleshooting, post here)

2 comments

  • Grant Petty

    Clicking the "Generate quality report..." menu item does not tell me where to find the resulting report or give me any other diagnostics.

  • Daniel (Pix4D)

    Hello Grant,

    The Quality Report(QR) is stored in .pdf format at ...\1_initial\report.

    It opens automatically after any computation. In case you have reoptimized and applied "Generate quality report" afterward, you can either open the .pdf file or go to "Process->Quality Report" within Pix4D.

    Regards.

Please sign in to leave a comment.