Menu Process > Generate Quality Report

Index > Interface > Menu Process  Previous  |  Next 

 

 
Access: On the Menu bar, click Process > Generate Quality Report (enabled once step 1. Initial Processing has been completed).

process_qualityreport.jpg

This process generates a new Quality Report that refers to the new reconstruction obtained after applying changes to the project once step 1. Initial Processing has been completed. Such changes can be:

  • Adding GCPs.
  • Adding Manual Tie points.
  • Adding Check points.
  • Changing coordinate systems.
  • Enabling/disabling images.
  • Running the Rematch and Optimize option.
 
Important: When adding GCPs, Manual Tie points, Check Points, changing coordinate systems or enabling/disabling images, the Reoptimize option has to be applied before generating the new Quality Report.

 